The Building Sustainability Index (BASIX) standards apply to all residential dwelling types and are part of the development application process in NSW. BASIX is one of the strongest sustainable planning measures to be undertaken in Australia.

In NSW, there are BASIX standards for water and energy usage and thermal performance that apply to:

  • all new residential dwellings
  • alterations and additions to dwellings that cost $50,000 or more
  • swimming pools of 40,000 litres or more.

To approve such developments, the consent authority (usually your local council) requires evidence that the development plan meets the BASIX standards.

Since 2004, more than 500,000 BASIX-compliant homes are estimated to have saved 12.3 million tonnes of greenhouse gas emissions, and 340 billion litres of drinking water.

Assessment process

To demonstrate your development meets the BASIX standards, you must conduct an assessment using the BASIX tool, which estimates the water and energy consumption, thermal performance and the embodied emissions of the building materials based on the information you provide. This information includes the floor area; the size, location and type of windows; type of insulation and type of hot water system being installed.

There are detailed help notes available on the BASIX website to guide you through the process. You can read our help notes for energy, water, thermal performance and the materials index.

Once you have successfully completed the assessment by meeting the BASIX standards, you must generate a BASIX certificate and submit it with your development application or complying development certificate. The BASIX certificate lists the key elements of the design, which are referred to as sustainability commitments.

Council or certifier

Councils are required to check the information on a BASIX certificate as part of their assessment of development applications and applications for complying development certificates. Similarly, certifiers are required to check the information on a BASIX certificate prior to issuing a construction certificate or occupation certificate.

For further guidance about how to check BASIX certificates, councils and certifiers should refer to the BASIX Guide: Checking thermal performance for the Simulation method.

For further information about using the planning portal, councils and certifiers should refer to How to manage your organisation administration account.

Validity of the certificate and changes to the project

BASIX certificate validity

  • A BASIX certificate is valid for 3 months, prior to submission to council or accredited certifier.
  • Once your BASIX certificate is lodged with the council or accredited certifier it is valid for the maximum life of the development application.
  • If your BASIX certificate is not lodged within 3 months you will need to generate a new certificate. This will incur additional fees.
  • Tip: To avoid additional fees we recommend the BASIX report function is used until your design is finalised and ready for lodgement.

Changes

  • If you have made changes to your project, then you will also have to update your BASIX certificate. This will mean completing another BASIX assessment and printing a new certificate. There is no additional charge to revise an issued certificate, if it relates to the same property and project recorded on the original certificate. It must also have been lodged or be valid to be lodged.
  • The commitments that you make for your project (as shown on the BASIX certificate), must be noted on the plans.

Managing large BASIX project files

Calculating large project files with multiple dwellings may take several minutes. Depending on the reliability of your internet connection, there is a risk data may be lost.

To minimise the risk of lost data or corrupted project files, it is recommended that users:

  • Do not unnecessarily hit the ‘Calculate’ button at the bottom right of each page. Calculating the BASIX score for large projects can be time consuming and is of little value until all data is entered for a project.
  • Do save the project regularly, particularly after entering a large block of project details.
  • Be patient - Do not attempt to navigate forward or back, enter new data or open another project file whilst the project is in the process of being saved or calculated.
  • Minimise other computer functions or background programs whilst a project is being saved or calculated.
  • Where appropriate, divide a large project into separable parts in accordance with the help note When is more than one BASIX certificate required?
  • The default limit on the number of dwellings that can be entered is 200 for single and multi-dwelling houses and 600 units in a residential flat building. If you need to add more dwellings, email info@service.nsw.gov.au for assistance. Include your BASIX user account details, the project name and number of additional dwellings required.

Forms

BASIX forms can be downloaded from this page. Click on the link of the form you wish to download and save the form to a folder on your computer. Open and complete the form using Acrobat Reader or Acrobat Professional*.

Attach any other documents required before emailing us at basix@planning.nsw.gov.au

Note: The Heritage Alternative Assessment Form requires signatures before sending it to us.

*If you open the forms within a browser window (i.e. Google Chrome, Firefox etc) you may experience difficulties completing the form. You will be able to fill in fields and print the form, however, you may not be able to save or submit the form. If so, we suggest downloading the form to your computer and opening it using Acrobat Reader or equivalent.