Regional and Place teams
Regional and Place planning teams service the department in regional NSW and metropolitan Sydney.
The department’s planning and assessment teams evaluate planning proposals and rezoning reviews, as well as preparing regional plans for regional areas of NSW, to achieve high-quality planning outcomes for land use.
The teams liaise between the department and local government. They work closely with stakeholders and the community to ensure balanced and sustainable outcomes.
The teams:
- help deliver strategies initiated by local councils
- review and assess planning proposals, rezoning reviews and the making of local environmental plans
- undertake state-led rezoning processes
- engage with council, community and stakeholders
- contribute to the review of planning policy and procedures
- perform legal functions including arranging formal agreements and site compatibility certifications
- prepare regional plans (for regional NSW only).
Regional teams (Regional NSW):
- Central Coast and Hunter
- Northern
- Southern
- Western.
Regional Boundaries NSW
In the metropolitan area the teams help the Greater Sydney Commission carry out district plans through the review of planning proposals, rezoning reviews and the making of local environmental plans.
Place teams (Greater Sydney):
- Sydney Eastern – Sydney City
- Sydney Eastern and South
- Sydney North
- Sydney Central (Greater Parramatta to Olympic Peninsula – GPOP)
- Sydney Central (Western)
- Sydney Western.
Metropolitan Boundaries NSW
Quarterly performance reports
Planning proposals KPI reporting
Q1 2020-21 Report
Combined regions | Performance indicator | Q1 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 78% within 20 days 47 of 60 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 43% within 40 days 6 of 14 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 0% within 90 days 0 of 1 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 76% within 120 days 32 of 42 non-delegated LEPs finalised within 120 days |
2020-21 Q1
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Central Coast and Hunter | 12 | 0 | 0 | 2 |
Northern | 4 | 0 | 0 | 3 |
Southern | 11 | 1 | 0 | 7 |
Syd Central (GPOP) | 7 | 2 | 0 | 5 |
Syd Central (Western) | 2 | 0 | 0 | 9 |
Syd Eastern-Sydney City | 1 | 0 | 0 | 0 |
Syd Eastern & South | 5 | 2 | 0 | 4 |
Syd North | 1 | 3 | 1 | 4 |
Syd Western | 6 | 6 | 0 | 3 |
Western | 11 | 0 | 0 | 5 |
Total | 60 | 14 | 1 | 42 |
Source: The figures above were derived from the database extract as at 15 October 2020.
Planning proposals KPI reporting
2020-21 Q2 Report
Combined regions | Performance indicator | Q2 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 79% within 20 days 44 of 56 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 83% within 40 days 10 of 12 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 67% within 90 days 2 of 3 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 74% within 120 days 25 of 34 non-delegated LEPs finalised within 120 days |
2020-2021 Q2
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Central Coast and Hunter | 11 | 1 | 0 | 0 |
Northern | 10 | 1 | 0 | 5 |
Southern | 12 | 1 | 1 | 6 |
Syd Central (GPOP) | 2 | 3 | 0 | 2 |
Syd Central (Western) | 4 | 1 | 1 | 6 |
Syd Eastern-Sydney City | 1 | 0 | 0 | 0 |
Syd Eastern & South | 2 | 1 | 0 | 3 |
Syd North | 0 | 0 | 0 | 3 |
Syd Western | 4 | 2 | 1 | 5 |
Western | 9 | 2 | 0 | 4 |
Total | 55 | 12 | 3 | 34 |
Source: The figures above were derived from the database extract as at 27 January 2021.
Planning proposals KPI reporting
2020-21 Q3 Report
Combined regions | Performance indicator | Q3 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 76% within 20 days 44 of 58 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 71% within 40 days 5 of 7 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | N/A within 90 days 0 of 0 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 76% within 120 days 42 of 55 non-delegated LEPs finalised within 120 days |
2020-2021 Q3
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Central Coast and Hunter | 6 | 0 | 0 | 3 |
Northern | 14 | 2 | 0 | 13 |
Southern | 8 | 2 | 0 | 9 |
Syd Central (GPOP) | 7 | 1 | 0 | 5 |
Syd Central (Western) | 1 | 0 | 0 | 6 |
Syd Eastern-Sydney City | 9 | 0 | 0 | 2 |
Syd Eastern & South | 1 | 1 | 0 | 4 |
Syd North | 2 | 0 | 0 | 2 |
Syd Western | 0 | 1 | 0 | 7 |
Western | 10 | 0 | 0 | 4 |
Total | 58 | 7 | 0 | 55 |
Source: The figures above were derived from the database extract as at 10 May 2021.
2020-21
Quarter 1 2019-20 KPI Report
Combined Regions | Performance Indicator | Q1 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 59% within 20 days 24 of 41 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 33% within 40 days 5 of 15 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 67% within 90 days 2 of 3 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 54% within 120 days 14 of 26 non-delegated LEPs finalised within 120 days |
2019-20 Quarter 1
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Central Coast and Hunter | 4 | 3 | nil | 4 |
Northern | 13 | 1 | nil | 6 |
Southern | 8 | 1 | nil | nil |
Syd Central (GPOP) | 3 | 1 | nil | 3 |
Syd Central (Western) | 4 | 1 | 1 | nil |
Syd Eastern-Sydney City | 1 | 3 | nil | 1 |
Syd Eastern & South | 3 | nil | nil | 5 |
Syd North | 4 | 1 | 1 | 1 |
Syd Western | nil | 4 | 1 | 3 |
Western | 1 | nil | nil | 3 |
Total | 41 | 15 | 3 | 26 |
Source: The figures above were derived from the database extract as at 21 October 2019.
Quarter 2 2019-20 KPI Report
Combined Regions | Performance Indicator | Q2 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 81% within 20 days 47 of 58 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 67% within 40 days 10 of 15 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 33% within 90 days 2 of 6 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 56% within 120 days 15 of 27 non-delegated LEPs finalised within 120 days |
2019-20 Quarter 2
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Central Coast and Hunter | 6 | 2 | 1 | 5 |
Northern | 17 | nil | nil | 2 |
Southern | 16 | 1 | 1 | 1 |
Syd Central (GPOP) | 3 | 3 | nil | 2 |
Syd Central (Western) | 2 | 1 | nil | 2 |
Syd Eastern-Sydney City | 2 | 1 | nil | 3 |
Syd Eastern & South | 4 | 1 | 2 | 4 |
Syd North | 1 | 2 | 1 | 2 |
Syd Western | nil | 3 | 1 | 3 |
Western | 7 | 1 | nil | 3 |
Total | 58 | 15 | 6 | 27 |
Source: The figures above were derived from the database extract as at 31 January 2020.
Quarter 3 2019-20 KPI Report
Combined Regions | Performance Indicator | Q3 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 79% within 20 days 30 of 38 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 48% within 40 days 13 of 27 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 0% within 90 days 0 of 1 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 65% within 120 days 13 of 20 non-delegated LEPs finalised within 120 days |
2019-20 Quarter 3
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Central Coast and Hunter | 1 | 1 | nil | 1 |
Northern | 8 | 1 | nil | 4 |
Southern | 12 | 1 | nil | 1 |
Syd Central (GPOP) | 2 | 5 | nil | 1 |
Syd Central (Western) | 3 | 3 | nil | 2 |
Syd Eastern-Sydney City | nil | 1 | nil | 1 |
Syd Eastern & South | 5 | 5 | nil | 4 |
Syd North | 1 | 3 | 1 | 4 |
Syd Western | 4 | 7 | nil | 1 |
Western | 2 | 0 | nil | 1 |
Total | 38 | 27 | 1 | 20 |
Source: The figures above were derived from the database extract as at 15 April 2020.
Quarter 4 2019-20 KPI Report
Combined Regions | Performance Indicator | Q4 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 77% within 20 days |
37 of 48 Routine Gateway Determinations issued within 20 days | ||
Complex Gateway determinations issued under delegation | 85% within 40 days | 33% within 40 days |
7 of 21 of Complex Determinations issued within 40 days | ||
Rezoning reviews | 85% completed within 90 days | 45% within 90 days |
5 of 11 Rezoning Reviews completed within 90 days | ||
Non-delegated LEPs finalised | 85% within 120 days | 57% within 120 days |
24 of 42 non-delegated LEPs finalised within 120 days |
2019-20 Quarter 4
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Central Coast and Hunter | 8 | nil | 1 | 1 |
Northern | 8 | 1 | nil | 4 |
Southern | 7 | 2 | 1 | 4 |
Syd Central (GPOP) | 1 | 1 | nil | 3 |
Syd Central (Western) | 2 | 6 | 2 | 5 |
Syd Eastern-Sydney City | 2 | 1 | nil | nil |
Syd Eastern & South | 4 | 4 | 5 | 6 |
Syd North | 1 | 3 | 2 | 6 |
Syd Western | nil | 3 | nil | 9 |
Western | 15 | nil | nil | 4 |
Total | 48 | 21 | 11 | 42 |
Source: The figures above were derived from the database extract as at 22 July 2020.
Combined Regions | Performance Indicator | 2019/2020 Financial Year |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 71% within 20 days |
147 of 191 Routine Gateway Determinations issued within 20 days | ||
Complex Gateway determinations issued under delegation | 85% within 40 days | 46% within 40 days |
36 or 79 of Complex Determinations issued within 40 days | ||
Rezoning reviews | 85% completed within 90 days | 36% within 90 days |
9 of 25 Rezoning Reviews completed within 90 days | ||
Non-delegated LEPs finalised | 85% within 120 days | 57% within 120 days |
65 of 114 non-delegated LEPs finalised within 120 days |
2019/2020 Financial Year
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Central Coast and Hunter | 20 | 6 | 2 | 10 |
Northern | 49 | 3 | nil | 15 |
Southern | 28 | 5 | 2 | 5 |
Syd Central (GPOP) | 9 | 10 | nil | 9 |
Syd Central (Western) | 11 | 11 | 3 | 10 |
Syd Eastern-Sydney City | 5 | 6 | nil | 5 |
Syd Eastern & South | 16 | 11 | 9 | 19 |
Syd North | 8 | 9 | 7 | 12 |
Syd Western | 4 | 17 | 2 | 17 |
Western | 41 | 1 | nil | 12 |
Total | 191 | 79 | 25 | 114 |
Source: The figures above were derived from the database extract as at 22 July 2020.
2018-19
Combined Regions | Performance Indicator | Quarter 1 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 78% within 20 days 49 of 63 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 50% within 40 days 11 of 22 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 75% within 90 days 6 of 8 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 69% within 120 days 11 of 16 non-delegated LEPs finalised within 120 days |
2018 to 2019 Quarter 1
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non–delegated LEPs finalised | |
---|---|---|---|---|
Southern | 8 | 3 | Nil | 1 |
Western | 11 | Nil | Nil | 2 |
Northern | 13 | 5 | Nil | 1 |
Hunter and Central Coast | 13 | 1 | Nil | 5 |
Sydney East | 3 | 7 | 5 | 2 |
Sydney West | 15 | 6 | 3 | 5 |
Total | 63 | 22 | 8 | 16 |
Source: The figures above were derived from the database extract as at 9 November 2018.
Combined Regions | Performance Indicator | Quarter 2 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 85% within 20 days 52 of 61 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 44% within 40 days 8 of 18 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 100% within 90 days 5 of 5 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 81% within 120 days 21 of 26 non-delegated LEPs finalised within 120 days |
2018 to 2019 Quarter 2
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non–delegated LEPs finalised | |
---|---|---|---|---|
Southern | 9 | 3 | Nil | 1 |
Western | 14 | Nil | Nil | 3 |
Northern | 14 | 1 | Nil | 0 |
Hunter and Central Coast | 5 | 1 | Nil | 10 |
Sydney East | 6 | 6 | 3 | 4 |
Sydney West | 13 | 7 | 2 | 8 |
Total | 61 | 18 | 5 | 26 |
Source: The figures above were derived from the database extract as at 18 January 2019.
Combined Regions | Performance Indicator | Quarter 3 |
---|---|---|
Routine Gateway determination issues under delegation | 85% within 20 days | 88% within 20 days 30 of 34 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 50% within 40 days 7 of 14 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 75% within 90 days 3 of 4 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 86% within 120 days 18 of 21 non-delegated LEPs finalised within 120 days |
2018 to 2019 Quarter 3
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non–delegated LEPs finalised | |
---|---|---|---|---|
Southern | 9 | 2 | Nil | Nil |
Western | 3 | Nil | Nil | 2 |
Northern | 11 | 2 | Nil | 1 |
Hunter and Central Coast | 3 | Nil | Nil | 4 |
Sydney East | Nil | 5 | 3 | 3 |
Sydney West | 8 | 5 | 1 | 11 |
Total | 34 | 14 | 4 | 21 |
Source: The figures above were derived from the database extract as at 8 April 2019.
Combined Regions | Performance Indicator | Quarter 4 |
---|---|---|
Routine Gateway determination issues under delegation | 85% within 20 days | 72% within 20 days 33 of 46 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 38% within 40 days 5 of 13 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 31% within 90 days 4 of 13 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 50% within 120 days 9 of 18 non-delegated LEPs finalised within 120 days |
2018 to 2019 Quarter 4
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non–delegated LEPs finalised | |
---|---|---|---|---|
Southern | 15 | 1 | 5 | 1 |
Western | 3 | Nil | Nil | Nil |
Northern | 4 | 6 | Nil | 3 |
Central Coast and Hunter | 4 | 2 | Nil | 6 |
Sydney East | 11 | 1 | 6 | 3 |
Sydney West | 9 | 3 | 2 | 5 |
Total | 46 | 13 | 13 | 18 |
Source: The figures above were derived from the database extract as at 17 July 2019.
Combined Regions | Performance Indicator | 2018/2019 Financial Year |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 81% within 20 days 165 of 204 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 46% within 40 days 31 of 67 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 65% within 90 days 22 of 34 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 73% within 120 days 61 of 84 non-delegated LEPs finalised within 120 days |
2018/2019 Financial Year
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Southern | 40 | 9 | 6 | 4 |
Western | 31 | 0 | Nil | 7 |
Northern | 42 | 14 | Nil | 7 |
Central Coast and Hunter | 25 | 4 | Nil | 25 |
Syd East | 20 | 19 | 19 | 12 |
Syd West | 46 | 21 | 9 | 29 |
Total | 204 | 67 | 34 | 84 |
Source: The figures above were derived from the database extract as at 17 July 2019.
2017-18
Combined Regions | Performance Indicator | Quarter 1 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 98% within 20 days 82 of 84 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 68% within 40 days 13 of 19 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 100% within 90 days 4 of 4 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 62% within 120 days 21 of 34 Non-delegated LEPs finalised within 120 days |
2017 to 2018 Quarter 1
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Southern | 16 | 4 | Nil | 1 |
Western | 17 | Nil | Nil | 1 |
Northern | 12 | 1 | Nil | Nil |
Hunter and Central Coast |
13 | 5 | Nil | 7 |
Sydney East | 15 | 4 | 3 | 7 |
Sydney West | 11 | 5 | 1 | 18 |
Total | 84 | 19 | 4 | 34 |
Combined Regions | Performance Indicator | Quarter 2 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 90% within 20 days 52 of 58 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 56% within 40 days 10 of 18 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 100% within 90 days 4 of 4 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 86% within 120 days 32 of 37 Non-delegated LEPs finalised within 120 days |
2017 to 2018 Quarter 2
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Southern | 7 | 1 | Nil | 1 |
Western | 5 | 1 | Nil | 3 |
Northern | 14 | 2 | Nil | 5 |
Hunter and Central Coast |
11 | Nil | 1 | 6 |
Sydney East | 13 | 6 | 3 | 10 |
Sydney West | 8 | 8 | Nil | 12 |
Total | 58 | 18 | 4 | 37 |
Combined Regions | Performance Indicator | Quarter 3 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 87% within 20 days 34 of 39 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 46% within 40 days 6 of 13 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 100% within 90 days 6 of 6 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 65% within 120 days 12 of 15 Non-delegated LEPs finalised within 120 days |
2017 to 2018 Quarter 3
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Southern | 4 | Nil | 1 | 1 |
Western | 3 | Nil | Nil | 2 |
Northern | 14 | 2 | Nil | Nil |
Hunter and Central Coast |
8 | 1 | Nil | 4 |
Sydney East | 2 | 5 | 1 | 7 |
Sydney West | 8 | 5 | 4 | 6 |
Total | 39 | 13 | 6 | 20 |
Combined Regions | Performance Indicator | Q4 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 80% within 20 days 49 of 61 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 40% within 40 days 4 of 10 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 93% within 90 days 13 of 14 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 76% within 120 days 22 of 29 non-delegated LEPs finalised within 120 days |
2017-18 Quarter 4
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Southern | 20 | 2 | nil | 2 |
Western | 5 | nil | nil | 5 |
Northern | 9 | 1 | nil | 5 |
Hunter and Central Coast | 6 | nil | 1 | 5 |
Syd East | 7 | 5 | 8 | 2 |
Syd West | 14 | 2 | 5 | 10 |
Total | 61 | 10 | 14 | 29 |
The figures above were derived from the database extract as at 4 July 2018.
Combined Regions | Performance Indicator | 2017/2018 Financial Year |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 90% within 20 days 217 of 242 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 55% within 40 days 33 of 60 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 96% within 90 days 27 of 28 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 73% within 120 days 88 of 120 non-delegated LEPs finalised within 120 days |
2017/2018 Financial Year
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Southern | 47 | 7 | 1 | 5 |
Western | 30 | 1 | nil | 11 |
Northern | 49 | 6 | nil | 10 |
Hunter and Central Coast | 38 | 6 | 2 | 22 |
Syd East | 37 | 20 | 15 | 26 |
Syd West | 41 | 20 | 10 | 46 |
Total | 242 | 60 | 28 | 120 |
2016-17
Combined Regions | Performance Indicator | Quarter 1 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 89% within 20 days 86 of 97 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 40% within 40 days 10 of 25 of Complex Gateway Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | No Rezoning Reviews completed Q1 NA |
Non-delegated LEPs finalised | 85% within 120 days | 79% within 120 days 15 of 19 Non-delegated LEPs finalised within 120 days |
2016 to 2017 Quarter 1
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Southern | 19 | 4 | Nil | 1 |
Western | 13 | 2 | Nil | 1 |
Northern | 18 | Nil | Nil | 2 |
Hunter and Central Coast |
10 | 3 | Nil | 7 |
Sydney East | 14 | 8 | Nil | 4 |
Sydney West | 24 | 8 | Nil | 3 |
Total | 98 | 25 | Nil | 17 |
Combined Regions | Performance Indicator | Quarter 2 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 97% within 20 days 65 of 67 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 81% within 40 days 21 of 26 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 100% within 90 days 7 of 7 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 56% within 120 days 15 of 27 Non-delegated LEPs finalised within 120 days |
2016 to 2017 Quarter 2
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Southern | 16 | Nil | Nil | 1 |
Western | 7 | 1 | Nil | 2 |
Northern | 12 | 1 | 1 | 4 |
Hunter and Central Coast |
17 | 1 | 1 | 4 |
Sydney East | 7 | 11 | 4 | 4 |
Sydney West | 9 | 13 | 1 | 12 |
Total | 68 | 27 | 7 | 27 |
Combined Regions | Performance Indicator | Quarter 3 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 100% within 20 days 57 of 57 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 100% within 40 days 10 of 10 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 100% within 90 days 6 of 6 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 100% within 120 days 17 of 17 Non-delegated LEPs finalised within 120 days |
2016 to 2017 Quarter 3
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Southern | 6 | Nil | Nil | 1 |
Western | 3 | Nil | Nil | 2 |
Northern | 11 | 2 | Nil | 4 |
Hunter and Central Coast |
8 | Nil | Nil | 3 |
Syd East | 17 | 2 | 4 | 3 |
Syd West | 12 | 6 | 2 | 4 |
Total | 57 | 10 | 6 | 17 |
Combined Regions | Performance Indicator | Quarter 4 |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 98% within 20 days 54 of 55 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 80% within 40 days 16 of 20 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 100% within 90 days 10 of 10 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 65% within 120 days 17 of 26 Non-delegated LEPs finalised within 120 days |
2016 to 2017 Quarter 4
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Southern | 6 | 2 | 1 | 3 |
Western | 8 | 0 | 0 | 1 |
Northern | 17 | 3 | 0 | 5 |
Hunter and Central Coast |
4 | 3 | 1 | 4 |
Sydney East | 16 | 7 | 5 | 5 |
Sydney West | 4 | 5 | 3 | 8 |
Total | 55 | 20 | 10 | 26 |
Combined Regions | Performance Indicator | 2016/2017 Financial Year |
---|---|---|
Routine Gateway determinations issued under delegation | 85% within 20 days | 95% within 20 days 260 of 274 Routine Gateway Determinations issued within 20 days |
Complex Gateway determinations issued under delegation | 85% within 40 days | 73% within 40 days 57 of 78 of Complex Determinations issued within 40 days |
Rezoning reviews | 85% completed within 90 days | 100% within 90 days 23 of 23 Rezoning Reviews completed within 90 days |
Non-delegated LEPs finalised | 85% within 120 days | 71% within 120 days 61 of 86 Non-delegated LEPs finalised within 120 days |
2016/2017 Financial Year
Routine Gateway determinations issued under delegation | Complex Gateway determinations issued under delegation | Rezoning reviews | Non-delegated LEPs finalised | |
---|---|---|---|---|
Southern | 46 | 5 | 1 | 6 |
Western | 31 | 3 | 0 | 5 |
Northern | 56 | 6 | 1 | 13 |
Hunter and Central Coast |
37 | 7 | 2 | 17 |
Sydney East | 55 | 25 | 13 | 15 |
Sydney West | 49 | 32 | 6 | 23 |
Total | 274 | 78 | 23 | 86 |