Skip to main content

Hornsby

TOD rezoning

The NSW Government is committed to delivering more well-located and affordable homes near transport, amenities and jobs.

The Transport Oriented Development (TOD) Accelerated Precincts will play a significant role in boosting housing supply near major transport hubs while promoting walkable, vibrant areas.

Hornsby was identified as an accelerated precinct due to its close proximity to the train station and key public transport interchanges, promoting walking and cycling opportunities.

This rezoning amends the planning controls for the Hornsby TOD Accelerated Precinct. This rezoning will provide:

  • capacity for over 6,000 new homes
  • capacity for 2,900 new jobs across the precinct
  • affordable housing contribution of between 3% to 10% for all new residential development in the precinct
  • new and upgraded parks and open space
  • new library, community centre, cultural and creative facilities
  • greener streets with better connectivity for walking and cycling.

You can find more information in the final rezoning documents located on the NSW Planning Portal.

Community consultation

The Hornsby Rezoning Proposal was exhibited with public consultation from 9 July to 23 August 2024.

During exhibition, the Department hosted multiple in-person community sessions and webinars which allowed us to directly engage with 223 members of the local community resulting in 337 submissions.

We thank the local community and other key stakeholders for providing feedback during public exhibition.

Following detailed consideration of submissions received during exhibition, several changes were made to the rezoning. These included:

  • capacity for up to 1,000 more homes in key areas
  • more community facilities
  • more open space at the heart of the town centre
  • provisions for a new bus interchange.

The rezoning came into effect on 27 November 2024.

Policy changes to streamline development assessment

We have introduced policy changes to streamline development assessment and accelerate housing delivery in the TOD Accelerated Precincts.

The reforms aim to have a consistent approach to both rezoning and assessment across the precincts.

An Explanation of Intended Effect (EIE) outlining the changes was on exhibition for public feedback between 9 July and 23 August 2024.

Feedback from the exhibition was taken into consideration and the changes implemented in the TOD Accelerated Precincts include:

  • a temporary State Significant Development pathway until November 2027 for residential development applications valued over $60 million in the TOD Accelerated Precincts
  • height and floor-space bonuses and the associated State Significant Development pathway for in-fill affordable housing will be turned off to avoid conflict with planning controls in TOD Accelerated Precincts, which include requirements for affordable housing
  • a 3-year exemption from some low-risk concurrence and referral requirements at the DA stage to speed up assessment timeframes because these matters are addressed at the rezoning stage
  • introducing a specific design excellence pathway in place of design competitions to streamline the delivery of housing while maintaining high-quality design. For more information go to Exemption from design competitions.

To see the final changes visit the NSW Planning Portal.

What happens next

Amendments have now been made to the Hornsby Local Environmental Plan 2013 (LEP) and new planning controls are now in effect. Development Applications (DA) can now be lodged with Hornsby Shire Council to assess development in accordance with these new controls. Any existing DAs will be assessed based on controls in effect at the time of lodgement.

Frequently asked questions

Why was Hornsby chosen to be part of the Transport Oriented Development Program?

In developing the Transport Oriented Development (TOD) Program, the Department undertook analysis of 305 transport stations within the Greater Sydney, Hunter, Central Coast and Illawarra regions to identify locations that have enabling rail, water and wastewater infrastructure capacity near the transport station to support additional housing growth.

Hornsby was chosen for an accelerated rezoning under the TOD Program announced in December 2023.

For more information, read the TOD Program assessment criteria (PDF, 121 KB).

Does this rezoning override local council planning rules? If so, why?

Under the TOD Program, the Department led this rezoning to address housing supply and affordability challenges and help meet the NSW Government's commitments under the National Housing Accord to deliver 377,000 new, well-located homes across the state by 2029.

Amendments have now been made to local planning rules in the Hornsby Shire Council area.

Are there plans for new community infrastructure such as roads, open space and parks to support this proposed growth?

The delivery of new open space and parks to support growth in Hornsby is an important component of this rezoning.

The NSW Government has committed $520 million to provide active transport links and good quality public open spaces in the TOD Accelerated Precincts.

The new Housing and Productivity Contribution will contribute towards providing state and regional infrastructure such as roads, hospitals and schools.

Council will continue to collect local infrastructure contributions from all development in the precinct.

The Department will continue to work with council to ensure additional growth resulting from the rezoning is included in councils’ infrastructure contribution plans to allow for the collection of funding towards local infrastructure such as roads, parks and cycleways.

Are there any plans for new schools to support the proposed growth as part of these plans?

The Department of Planning, Housing and Infrastructure has worked collaboratively with key state agencies, including Health NSW and the Department of Education, to ensure sufficient infrastructure is provided to support the growth in the precinct.

The Department of Education has advised that existing schools in the Hornsby area can be upgraded to accommodate the anticipated population growth from this rezoning.

The Department of Education will continue to monitor growth to ensure adequate capacity is provided to support the future population of the precinct.

Have any measures been introduced to encourage live entertainment in TOD Accelerated Precincts?

The Department is encouraging local councils to establish special entertainment precincts to make sure that the TOD Accelerated Precincts are lively and vibrant places to live, work and play.

The Department will assist councils to identify appropriate areas in the TOD locations to maximise the benefits of having a Special Entertainment Precinct and help councils make this change to their local planning instruments.

For more information go to Special Entertainment Precincts.

What is the approach to affordable housing?

The Department has established a 3% base rate across all sites and higher rates for key sites within all the TOD Accelerated Precincts.

In the Hornsby TOD Accelerated Precinct, there are 3 key sites identified which will have mandatory contributions of 4% to 10% affordable housing.

All affordable housing contributions within the TOD Accelerated Precincts are mandatory either as a monetary contribution or an in-kind contribution, and any affordable homes provided must be managed by a registered Community Housing Provider (CHP).

A savings provision is included which means that any development applications that are currently lodged (but not yet determined) with a council or the Department are not required to pay this affordable housing contribution, however they will still be required to pay the contribution that applied when the development application was lodged.

How were the key sites selected and an affordable housing contribution applied?

Key sites were selected following detailed economic analysis of individual site characteristics and against the objectives of the rezoning. Affordable housing rates were developed based on feasibility testing, which considered other contributions, fees and charges and development costs.

When is it expected that these homes will be delivered within Hornsby?

This rezoning provides the opportunity for growth and change over the next 10–15 years and beyond. It is likely development will occur in a staged manner in the short, medium and long term. The uptake of development will be subject to market conditions and development feasibility.

Subscribe to receive project updates

Timeline

  1. Draft rezoning proposal

    August 2024

    A draft rezoning proposal is available for public comment.

  2. Response to submissions

    Late 2024

    Feedback provided through the exhibition will be reviewed, and a report outlining the key themes raised during the exhibition, and what we are doing to respond, will be released.

  3. Rezoning

    27 November 2024

    The rezoning came into effect on 27 November 2024.